Monday, January 29, 2007

day 11, now come to the 2nd most difficult part (the #1 goes to the bath tub drain repositioning): plumbing to fit the double sink vanity for the full bath. The original one is single sink. Part of the wall behind the vanity is cut open. Even the wall of the new room is cut too to get the job done. Posted by Picasa

0 Comments:

Post a Comment

<< Home