Saturday, March 31, 2007

view from mirror
Posted by Picasa
close look of the new vanity. I really like the color of this one.
Posted by Picasa
New shower. The door company will come in to measure for new temp glass enclosure next monday. Well, looks like it will more one more week before I can take shower in my own bath
Posted by Picasa
The "personal hydren" system is in. I'm really not good at plumbing. Took me 2 hours just to get no leak connection done.
Posted by Picasa
after several error, the vanity top is in place. The one we bought has been scrapped by a wrong cut. It might be a good thing for us though. We both like the new top better. Although it cost 2 more days of working
Posted by Picasa
The project started on Feberuary. It's now almost Easter. Irene is "egg hunting"
Posted by Picasa
after my DIY work, contractor come back to install the mirror sliding door
Posted by Picasa
The tub finally gets in. I will "test the water" tomorrow
Posted by Picasa
day n-2, new toilet is in place now. It's not working though. The contractor will come back to find the plumbing
Posted by Picasa
finally I can get my closet orgnizer installed. It took me 2 hours, much longer than expected:-( The final result is not bad though. I will get another draw piece and intall that later
Posted by Picasa

Wednesday, March 28, 2007

another look of the tub
Posted by Picasa
one more day, tub in place
Posted by Picasa

Tuesday, March 27, 2007

New closet trim, done!
Posted by Picasa
Roman tub forcet set, Done
Posted by Picasa
Shower wall, Done!
Posted by Picasa
New bathroom window, Done!
Posted by Picasa
All marber floor and shower surroundings, Done
Posted by Picasa
New door for bathroom, Done!
Posted by Picasa
New door for the bed room, Done!
Posted by Picasa
Almost to the end now.
Crown molding in bed room, done!
Posted by Picasa

Monday, March 26, 2007

The new bay window makes the room looks larger
Posted by Picasa
After 4 weeks, finally it looks like a bathroom now. Hopefully everything can be done in a week now.
Posted by Picasa

Wednesday, March 21, 2007

new bay window in master bedroom. The wood trim is not finished yet. More work tomorrow.
The paint work is half done waiting for the window.
Posted by Picasa
the new franch rail sliding door is in place in family room
Posted by Picasa
new tile, it's over 3 weeks now
Posted by Picasa